Saturday 12 APR 2014 - building A-frame for gantry lift to pull the engine/trans from the MGB, removing hood and all connections to engine/trans. Sunday 13 APR 2014 - lakeside trials for Malaya and QE at the park we normally battle at, then lunch en route returning to Tugboat's shop for work and play. Lakeside fun starts 0900